White freestanding bathtub beside a tiled surround with a corner shelf and a brass spout

Shower to bathtub conversion

Walk In Shower to Bathtub Conversion in Scottsdale

The shower comes out and a tub with a tiled surround goes in its place. The first thing the site visit measures is which tubs the footprint takes.

Modern European Tile project photography

Tile for the New Surround

The tub adds a new white or colored surface beside the existing floor and vanity, so compare the surround tile with that finish in the showroom. Agree the tile height, the exposed edges and any shelf or niche before the order.

Select the exact reference for the wall, since not every item in a collection shares the same application.

Navy House of Tones wall tile framing a white bath and doorway
Tubadzin manufacturer imagery

Convert, or Keep the Shower?

The conversion suits some households and not others, and we say which case yours is when we see the house.

Convert if
The house has no tub at all and the household or the market wants one: families bathing small children, buyers who expect a tub and anyone who misses soaking.
Think twice if
This is the home’s only walk-in shower and someone in the house values step-free entry, since a tub wall is the exact barrier the other conversion exists to remove.
A second bathroom
A home with a second bathroom usually solves this by giving each room its own job.

The opposite journey is on bathtub to walk in shower conversion.

How the Conversion Runs

  1. Showroom selection

    The surround tile, the trim and the tub are chosen together as one decision.

  2. Measure and written scope

    A preliminary measure and site visit show which tubs the footprint takes. The written scope names the waterproofing details of the surround, who supplies and sets the tub and who performs the plumbing work, and it sets target dates.

  3. Removal and substrate

    The shower assembly comes out to the substrate, with glass and hardware first. The exposed base and walls are corrected before anything new goes in.

  4. Tub, surround and sign-off

    The tub is set level and supported. The surround is built as a system, checked before tile goes on, then tiled and sealed at every junction. You sign off the work and every change at the walkthrough.

Hidden conditions found during removal are agreed as a change before work continues.

Tubs in Our Projects

Baths and tiled surrounds from our projects (Modern European Tile project photography). See the full projects: Brass and Lattice Master Bath and White Marble Look Bath.

“Agata is a wonderful person, very friendly and helpful. My experience was great from beginning to end. They have a great selection of quality modern tiles. I would highly recommend Modern European Tile.”

Trevor, Google review · Read our Google reviews

Who We Work With and What It Costs

Homeowners
Bring the shower’s measurements and photos of the route in: stairs, door widths and turns. A tub has to fit the room, its support and the way through the house.
Designers and builders
Send drawings or a site address, and tell us if the tub is specified. Its fit, drain and supply arrangement are checked against the footprint first.
Tub with or without a shower
Whether the tub is also used as a shower changes the scope, so we settle it before the surround is specified.

Cost context

Shower to tub conversions in this market commonly run about $5,000 to $15,000, depending on the tub and the drain work. That is a planning range, not a Modern European Tile quote. Your written scope gives the figure for your project and sets target dates.

What moves the price:

  • drain position, the main variable, priced explicitly in the scope
  • the tub you choose and the route it takes into the room
  • correction of the exposed base and walls after the shower is removed
  • surround tile, height, and any niche or shelf

What the Conversion Includes

  • Shower removal to the substrate

    Structure and substrate are corrected before anything new goes in.

  • Tub set level and supported

    Sealed at every junction.

  • A waterproofed, tiled surround

    Built as a system with trim and edge details, checked before tile goes on.

  • Niche, shelf and hardware

    Tub-height niche or shelf details where the design calls for them, and hardware and finish coordination at the end.

Shower to Bathtub Questions

Another question? Call (602) 885-8075.

Which tub will fit?

The shower’s footprint limits which tubs fit, so the site visit measures it first. The tub must also fit its support and the route through the house.

Who supplies the tub and does the plumbing?

The written scope names who supplies and sets the tub and who performs the plumbing work, before the surround is installed. The scope covers as much of the project as you choose: the tile alone or the whole room, agreed in writing.

Should I convert my only shower?

Think twice if it is the home’s only walk-in shower and someone values step-free entry. A home with a second bathroom usually gives each room its own job.

How long is the room out of use, and what about permits?

The return-to-use date depends on the installation and sealing products as well as the trade schedule, and the written scope sets target dates. Permits and HOA requirements are agreed per project in the written scope.

Tub conversions in the Phoenix area

Bring the Shower’s Measurements

Send the shower’s footprint, photos of the route in, and the tub and surround tile you are considering. A preliminary measure comes before the written scope, and we reply to quote requests within 24 hours.

Contracting services are performed by MPP Group Service Inc, a licensed Arizona contractor (ROC 345369). We work across the Phoenix area: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Paradise Valley, Arcadia and Fountain Hills.