Walk in and curbless showers
Walk In and Curbless Showers in Scottsdale
A curbless shower has no raised threshold, so the floor continues into the shower. We confirm the depth, slope and drain on site, in writing, before you commit.
Modern European Tile project photography
Surfaces for the Shower and the Floor Around It
The shower floor has to suit wet barefoot use and the shape of the slope. A large bathroom floor tile cannot automatically continue through a point-drain shower without a new layout and a product check, and a linear drain gives a different geometry.
Brainstorm
Floor panels, 47 × 23.5 in (119.8 × 59.8 cm)
Large format floor panels for the open bathroom floor. Shower floor suitability must be confirmed for the exact reference and drain layout.
Freespace
Through-body porcelain, R10, A+B barefoot classes
A rated floor surface to compare. Confirm the exact reference for the shower floor and the drain layout.
Organic Matt
Matt walls and a rated 23.5 × 23.5 in floor
Stone look wall panels with a matching rated floor tile and steel strips for edges.
This page covers the shower entry. A complete room redesign starts with the bathroom projects page.
What Curbless Actually Means
A walk-in shower may use a door or an open entry. A curbless shower removes the raised threshold, so the floor construction and drainage become central to the project.
- Depth and slope
- The available depth, slope and drain connection decide whether a flush entry is feasible in the existing room. We answer that in writing after the site visit, before you commit.
- Drain
- A linear drain at the wall and a point drain at the center give different geometry. Either is chosen with the tile layout and needs an approved floor reference and a compatible assembly.
- Waterproofing
- It extends past the wet zone and is checked before tile goes on. See shower waterproofing.
A flush threshold does not by itself establish accessibility or code compliance. Those requirements are evaluated for your particular project.
How a Walk In or Curbless Shower Runs
-
Showroom selection
The floor that runs through, the wall panels and the look of the drain are chosen together.
-
Site visit and structural answer
A preliminary measure and the site visit answer the curbless question for your room. The written scope names the approach, the waterproofing extent and the glass plan, and sets target dates.
-
Removal, structure and system
Removal and structural work come first, then the waterproofing system, checked before tile goes on.
-
Tile, glass and sign-off
Tile is set and the glass follows. You sign off the work and every change at the walkthrough.
Hidden conditions found during removal are agreed as a change before work continues.
Showers in Our Projects
Walk-in showers from our projects (Modern European Tile project photography). See the full projects: Brass and Lattice Master Bath, Ribbed Beige Master Bath and Indoor Outdoor Master Bath.
“Bathroom remodel: extremely professional, excellent detail, 10/10 would recommend!”
Keila, Google review · Read our Google reviews
Who Goes Curbless and What It Costs
- Homeowners
- Owners who plan to stay in the house choose it, and so do design-led remodels that want an uninterrupted floor plane. Bring photos and tell us how you use the room: entry space, storage, a possible seat.
- Designers and builders
- Send drawings or a site address. Any structural modification, drain relocation or separate trade work is named in the written scope.
- Rooms where it does not work
- In some rooms the structure rules a flush entry out. We say which it is after the site visit, not after the demolition.
Cost context
Custom walk-in builds in this market commonly run about $8,000 to $18,000. Curbless sits at the top of that range, and above it where structure is involved. That is a planning range, not a Modern European Tile quote. Your written scope gives the figure for your project and sets target dates.
What moves the price:
- whether the floor allows a flush entry
- structure and drain work
- waterproofing extended past the wet zone
- the glass plan and the tile, large format or mosaic floors
What the Project Includes
-
The structural answer
What your floor allows, in writing, before you commit.
-
Slope for a flush entry
Recessed or built-up slope work, where the structure allows it.
-
Waterproofing past the wet zone
Extended beyond the shower and checked before tile goes on.
-
Drain, tile and glass
A linear or point drain chosen with the tile layout, floors set to the slope, and glass planned for door-free or door-in entries.
Walk In and Curbless Questions
Another question? Call (602) 885-8075.
Can every bathroom go curbless?
Not every room. The available depth, slope and drain connection decide whether a flush entry is feasible, and we answer that in writing after the site visit.
Does a flush threshold make the shower accessible?
A flush threshold does not by itself establish accessibility or code compliance. Those requirements are evaluated for your particular project.
Can my bathroom floor tile run into the shower?
Not automatically. The shower floor has to suit wet barefoot use and the slope, so a large floor tile needs a new layout and a product suitability check before it continues into a point-drain shower.
What about permits, HOA rules and plumbing?
Permits and HOA requirements are agreed per project in the written scope. The scope covers as much of the project as you choose, and it names who performs any drain relocation, structural or glass work.
Walk in showers in the Phoenix area
Bring Photos of the Room and Your Plans
Send photos of the room, drawings if you have them, and how you use the shower today. A preliminary measure comes before the written scope, and we reply to quote requests within 24 hours.
Contracting services are performed by MPP Group Service Inc, a licensed Arizona contractor (ROC 345369). We work across the Phoenix area: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Paradise Valley, Arcadia and Fountain Hills.