Walk in shower with a large grey panel wall, backlit niches, brass trim and a white pebble floor

Design and installation from the showroom

Shower Remodel in Scottsdale and the Phoenix Area

Same footprint, new shower: surfaces, niche, bench and glass rebuilt over waterproofing that is checked before tile.

Modern European Tile project photography

Wall Tile for the Rebuilt Shower

The wall tile, floor tile, niche, bench and glass need to work as one assembly. In the showroom you can compare the visible surfaces at full size; on the project, their dimensions decide where joints and cuts fall.

The shower floor must use a product approved for its application and drain layout. Wall mosaics and decorative strips are not substitutes for that check. What sits under the tile: shower waterproofing.

Grey House of Tones wall tile beside a basin and a tiled shower
Tubadzin House of Tones manufacturer imagery

What a Shower Remodel Is

A shower remodel rebuilds the shower where it stands. The old surfaces come out, the assembly underneath is inspected and corrected, and a new waterproofing system goes in, checked before a single tile is set. Tile over a tired assembly will fail again, and opening the walls is the cheapest moment to correct what is underneath.

A failed shower
Hollow sounds, opening grout or a smell that will not clear. We assess the cause on site before quoting, because photos cannot confirm hidden waterproofing.
A shower that is fine but dated
The assembly is sound and the surfaces are tired. This is the simplest version of the project.
A fixed footprint
The walls stay where they are, and everything inside them is in play: tile, niche, bench, entry and glass.

If you want to lose the tub or gain one, see bathtub to walk in shower conversion and walk in shower to bathtub conversion. For a curbless entry, see walk in and curbless showers.

How a Shower Remodel Runs

  1. Selection in the showroom

    Wall tile at full size, the floor mosaic, trim and glass direction are chosen as one palette.

  2. Assessment and written scope

    A preliminary measure and a site assessment come before the written scope, which names the waterproofing and what stays, with the price and target dates.

  3. Removal, waterproofing and tile

    Removal to the substrate and correction, then the waterproofing system and its check, then wall tile to full height and the shower floor, in that order.

  4. Glass, curing and sign-off

    Glass and hardware go last. Return to use depends on the curing of the installation products. You sign off the work and every change at the walkthrough.

The written sequence covers removal, assessment, the waterproofing system and its checks, tile installation, finishing and return to use. Findings are reported before work continues, and hidden conditions found during removal are agreed as a change before work continues.

Shower Rebuilds in Our Projects

Showers from our finished projects, with backlit niches, brass trim and pebble floors (Modern European Tile project photography). See the full projects: the Brass and Lattice master bath shown above, the Indoor Outdoor master bath and the Ribbed Beige master bath.

“Bathroom remodel: extremely professional, excellent detail, 10/10 would recommend!”

Keila, Google review · Read our Google reviews

What We Need From You and What It Costs

Photos
Bring photos of the whole enclosure and close views of cracked tile, damaged joints or staining. They help us prepare, but photographs cannot confirm the condition of hidden waterproofing, so the shower is assessed on site.
Scope
The scope covers as much of the project as you choose, agreed in writing. Plumbing and glass responsibilities are identified separately where those trades are involved.
Permits and HOA
Permits and HOA requirements are agreed per project in the written scope.

Cost context

A custom tiled shower rebuild in this market commonly runs about $8,000 to $18,000. That is a planning range, not a Modern European Tile quote. Your written scope gives the figure for your project and sets target dates.

What moves the price:

  • the condition of the existing assembly
  • access and drainage
  • tile, niche and bench details
  • glass and any separate plumbing work

What the Remodel Includes

  • Demolition to substrate

    Findings are reported before work continues.

  • Waterproofing, checked before tile

    The core of the job.

  • Wall tile and shower floor

    Wall tile to full height, chosen at full size, and a floor in an approved material and a format compatible with the drainage layout.

  • Niche, bench, curb and glass

    Built as system parts, with glass and hardware coordinated last, after the tile is set.

Shower Remodel Questions

Another question? Call (602) 885-8075.

Can I just retile my shower?

Sometimes. Retiling alone only makes sense when the layers under the tile are sound, and photos cannot confirm that. We assess the shower on site before the method and the price are settled.

Does a remodel change the shower’s footprint?

No. A remodel rebuilds the shower where it stands. If you want to remove the tub, see bathtub to walk in shower conversion.

Is a bench or niche included?

A bench or niche is included when its location, support and waterproofing can be resolved in the agreed scope.

Who handles the glass and the plumbing?

Glass and hardware are coordinated at the end, after the tile is set. Plumbing and glass responsibilities are identified separately where those trades are involved, and the written scope names who performs each part.

Shower remodels in the Phoenix area

Bring Photos of the Whole Shower

Send photos of the whole enclosure and close views of any damage, and tell us what you want to change. A preliminary measure comes before the written scope, and we reply to quote requests within 24 hours. Visit the showroom or call (602) 885-8075.

Contracting services are performed by MPP Group Service Inc, a licensed Arizona contractor (ROC 345369). We work across the Phoenix area: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Paradise Valley, Arcadia and Fountain Hills.