Design and installation from the showroom
Bathtub to Walk In Shower Conversion in Scottsdale
The tub comes out and a waterproofed walk-in shower goes into its footprint, with the tile, niche and glass decided together in our showroom.
Modern European Tile project photography
Wall Tile for the New Shower
Wall tile and shower floor material do different jobs. Compare the wall collection at full size in the showroom, then confirm a floor product approved for the wet barefoot application and compatible with the planned slope.
Night Queen
15.5 × 47 in (39.8 × 119.8 cm)
Gloss wall panels in white and black, with a copper accent piece in the same format.
Sophisticated
35.5 × 13 in (89.8 × 32.8 cm)
Gloss and stone look walls, with mosaics, strips and decor pieces in gold, pearl and black.
Serenity
35.5 × 13 in (89.8 × 32.8 cm)
White gloss wall tile and a structured decoration, with a single copper strip.
Organic Matt
35.5 × 13 in (89.8 × 32.8 cm)
Matt stone look walls in white and gray, with smooth and structured faces.
A decorative mosaic is not assumed to be a shower floor tile just because the pieces are small, so the floor is confirmed for the exact product. Agree the niche and edge details before tile quantities are final.
What Happens in the Footprint
The tub and its surround come out and the exposed assembly is corrected. A walk-in shower is then built in the same footprint as a full waterproofing system: pan, slope, a curb or curbless entry and tiled walls, checked before tile.
- Size
- The tub’s dimensions do not set the finished shower’s dimensions. Wall build-up, the drain, glass and any bench all take space.
- Entry
- A curbless entry depends on the floor construction. It is not an automatic part of a conversion, and the written scope states whether the entry is curbed or curbless.
- Plumbing
- Plumbing stays where it is unless you choose otherwise. Moving the drain or valve is the main cost variable, and the scope prices it explicitly.
More on the entry: walk in and curbless showers.
How a Conversion Runs
-
Selection and written scope
Wall tile, the shower floor, trim and glass direction are decided together in the showroom. A preliminary measure comes before the written scope, which names the waterproofing, any separate plumbing, structural or glass work and who performs it, plus the price and target dates.
-
Tub and surround out
The tub and its surround are removed and the wall is opened to the state the rebuild needs. With the tub gone, the exposed walls and base can be assessed properly.
-
Waterproofing and tile
The waterproofing system is built and checked before tile goes on. Then the walls and the shower floor are tiled, with niche, bench and trim details built into the system.
-
Glass, curing and sign-off
Glass and hardware come last, so nothing lands on new tile. The curing requirements of the installation products decide when the shower can be used. You sign off the work and every change at the walkthrough.
Hidden conditions found during removal are agreed as a change before work continues. Ask for the sequence through glass installation and the expected time without this bathroom; the written scope sets target dates.
Showers and Tubs in Our Projects
Bathrooms from our finished projects where a glass shower and a freestanding tub share the room (Modern European Tile project photography). See the full projects: the Wood and Concrete Spa Bath and the White Marble Look Bath. The compact shower above is from the Geometric Guest Bath.
“Great products and installation. Professional and efficient.”
Neil, Google review · Read our Google reviews
Who Should Convert and What It Costs
- Convert when
- Your household showers daily and rarely bathes, the tub wall is harder to step over than it used to be, or the tub’s footprint is the only place a good shower can fit.
- Think twice when
- This is the home’s only tub and small children or resale are in the picture. A house often wants one tub somewhere. If another bathroom has one, the decision is easier.
- Our advice
- We will tell you which case you are in when we see the room. The opposite journey has its own page: walk in shower to bathtub conversion.
Cost context
A custom tiled tub to shower conversion in this market commonly runs about $5,000 to $15,000. That is a planning range, not a Modern European Tile quote. Your written scope gives the figure for your project and sets target dates.
What moves the price:
- moving the drain or valve, the main cost variable
- pan, slope and a curb or curbless entry
- tile, niche and bench details
- glass and any separate plumbing or structural work
What the Conversion Includes
-
Tub and surround removal
The wall is opened to the state the rebuild needs.
-
Waterproofing, checked before tile
Pan, slope and wall system built and checked before any tile.
-
Entry and shower floor
Curbed or curbless, decided by the room’s floor structure, with a floor product approved for the wet barefoot application.
-
Tile, niche and glass
Walls chosen at full size, niche, bench and trim built into the system, and glass and hardware coordinated at the end.
Conversion Questions
Another question? Call (602) 885-8075.
Can the new shower be curbless?
Sometimes. A curbless entry depends on the floor construction, so it is decided from the room’s floor structure and stated in the written scope.
Will the shower be the same size as the tub?
Not automatically. Wall build-up, the drain, glass and any bench all take space, so the tub’s dimensions do not settle the shower’s.
Will you move the plumbing?
Plumbing stays where it is unless you choose otherwise. If you want the drain or valve moved, the written scope prices it explicitly and names who performs the plumbing.
What about permits and HOA rules?
Permits and HOA requirements are agreed per project in the written scope.
Tub to shower conversion in the Phoenix area
Bring Photos of the Bathroom and the Shower You Want
Send photos of the whole bathroom, the tub you want removed and the tile you are considering. A preliminary measure comes before the written scope, and we reply to quote requests within 24 hours.
Contracting services are performed by MPP Group Service Inc, a licensed Arizona contractor (ROC 345369). We work across the Phoenix area: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Paradise Valley, Arcadia and Fountain Hills.