Bathroom with a large marble look floor, a double vanity and a sliding glass wall opening to an outdoor shower

Design and installation from the showroom

Bathroom Floor Tile in Scottsdale

The floor-only job: the old floor comes out and a rated porcelain floor goes in, with the shower and walls left as they are. You choose the tile at full size in our showroom, and our team installs it.

Modern European Tile project photography

Floors We Set in Bathrooms

A bathroom floor needs a floor-rated product chosen for the actual conditions of use. We compare the manufacturer information for each reference, including the finish and the DIN slip rating where one is published. An R-value alone does not make a tile suitable for a wet barefoot shower floor, so the open floor and the shower base are separate decisions.

Compare every floor reference and its rating in porcelain tile flooring. For a floor and walls from one set, look at Serenity, a soft toned wall and floor set. Its polished floor tile carries no slip rating, which keeps it to low traffic floors. Wood look planks are also in Tori Take.

Light Freespace porcelain floor viewed from above with visible grout lines
Pastorelli Freespace manufacturer imagery

Where the New Floor Meets the Room

In a floor-only job the room keeps its other decisions, so the new floor has to meet them cleanly. A change in tile thickness can affect the shower curb, the tub and the door even when the layout stays the same.

Base
The old tile comes out and the base is checked for moisture. Every surface is checked and prepared as the selected tile requires, before setting starts.
Junctions
Movement joints go where the room needs them, with clean joints at the tub, the shower curb and the door threshold. We check that the door can clear the finished floor.
Layout
Squares can simplify a compact floor, while planks introduce direction. The cuts at the doorway, tub and vanity matter more than the format on its own.

What the ratings mean: tile slip ratings explained.

How a Floor-Only Job Runs

  1. Photo, measure and written scope

    Send a photo from the doorway and the approximate room size. A preliminary measure comes before the written scope, which sets out removal, preparation, the tile, who handles the fixtures and baseboards, the price and target dates.

  2. Removal and base

    The old floor comes out. The base is checked for moisture and corrected as the selected tile requires. If removal shows a damaged or unsuitable base, we discuss the correction before new tile covers it.

  3. Layout and setting

    Joint direction, perimeter cuts and the transition into the hall are agreed from the tile selection, then the tile is set with movement joints where the room needs them.

  4. Grout, curing and handover

    Grout, sealed perimeter details where the floor meets wet zones, and the return of the fixtures. The curing time of the products decides when the floor can carry traffic. You sign off the work and every change at the walkthrough.

Hidden conditions found during removal are agreed as a change before work continues. The sequence is in the written scope, so you can plan access to another bathroom if you need one.

Bathroom Floors in Our Projects

Bathroom floors from our finished projects, from long master baths to a bathroom that opens to an outdoor shower (Modern European Tile project photography). See the full projects: Brass and Lattice and Ribbed Beige master baths, and the Indoor Outdoor master bath shown above.

“Mariousz was amazing! Floor looks incredible. Neighbors were impressed and asked for him”

Chantz, Google review · Read our Google reviews

What the Job Covers and What It Costs

Floor only
You keep the shower, walls, vanity and tub. The scope covers as much of the project as you choose, the tile alone or the whole room, agreed in writing.
Fixtures and trades
The written scope states who removes and reinstalls the toilet or other fixtures, whether baseboards stay and how adjacent finishes are protected. Plumbing is coordinated with the responsible trade rather than assumed to be part of tile setting.
Designers and builders
Send drawings or a site address. A preliminary measure comes before the written scope.

Cost context

Installed tile work in this market commonly runs about $10 to $30 per square foot, and a bathroom floor about $1,500 to $4,000. That is a planning range, not a Modern European Tile quote. Your written scope gives the figure for your project and sets target dates.

What moves the price:

  • removal of the old floor
  • preparation and moisture check of the base
  • fixture and baseboard coordination
  • format, layout, openings and cuts

What the Floor Job Includes

  • Removal of the old floor

    Findings are reported before work continues.

  • Base correction and moisture check

    The base is corrected and checked for moisture before any tile.

  • The new floor

    Chosen at full size in the showroom, with the rating in writing.

  • Thresholds and junctions

    Door, tub, curb and vanity toe-kick lines, with sealed perimeter details where the floor meets wet zones.

Bathroom Floor Questions

Another question? Call (602) 885-8075.

Can you replace only the bathroom floor?

Yes. The scope covers as much of the project as you choose, from the floor alone to the whole room, agreed in writing. In a floor-only job the shower and walls stay as they are, and the new floor is detailed to meet them.

Can the same tile go on the shower floor?

Only if the product is approved for it. An R-value alone does not establish that a tile suits a wet barefoot shower floor, so we compare the manufacturer data, including the DIN slip rating, for the exact reference.

Can you install tile I bought somewhere else?

Yes. When you supply the tile, our warranty covers the installation, not the material.

What about permits and HOA rules?

Permits and HOA requirements are agreed per project in the written scope.

Bathroom floors in the Phoenix area

Bring a Photo From the Doorway

Send a photo from the bathroom doorway, the approximate room dimensions and the tile you are considering. A preliminary measure comes before the written scope, and we reply to quote requests within 24 hours.

Contracting services are performed by MPP Group Service Inc, a licensed Arizona contractor (ROC 345369). We work across the Phoenix area: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Paradise Valley, Arcadia and Fountain Hills.